HELLENIC PETROLEUM (ELPE), 2011
The project carried out for Hellenic Petroleum (ELPE) aimed at the control and monitoring of the quality of treated effluent and the sea where disposal takes place from the wastewater treatment plant treating petroleum effluents. The methodology for the implementation of the project was the following:
Activity 1: Sampling, measurements and analyses of the treated effluent of the wastewater
Activity 2: Sampling, measurements and analyses of sea water
Activity 3: Sampling, measurements and analyses of sea sediments
Activity 4: Assessment of the results and conclusions
Activity 5: Insertion of data
The deliverables included:
Technical reports on the results for Activities 1-4, every 3 months.
Interim technical reports every four months
Final Technical Report assessing the results